The National Park Service at Willow Beach Marina, AZ

Owner: US Department of Interior – National Park Service – Lake Mead National Recreation Area – Purchased via GSA

Scope of Work: Design build 90 slip expansion for the Willow Beach Marina complete with floating dock structures, electrical service, fire hose safety system, and winch & cable anchorage.

HDB Marine, a certified GSA contract holder, has completed the construction of the Willow Beach Marina Expansion. Project supervisor, Brian White, stated that was a pleasure to work with the Willow Beach project manager, Dave Hack and HDB sub-contractors HighEnergy and DoneRight Plumbing. This project features the HDB Force 7 galvanized steel dock system with polyethylene encased flotation, and rock-face concrete deck panels.

Residential

Whiskeytown Headquarters Dock features the HDB Force 7 galvanized steel dock system with the premier installation of the HDB Slim Line Roof System, utilizing wide-spaced columns and overhead finger bracing. The dock features durable polyethylene encased flotation and custom broom-finished concrete deck panels. It is anchored with two hand-crank winches on the lake side & two fixed cable lines to shore anchors.

Government

HDB Marine recently manufactured and installed a new Launch/Boarding Dock for the Port of Siuslaw.
New and Unique Design as specified by Oregon Marina Board: The dock is constructed with heavy treated timbers that are coated with Polyurea Plastic to reduce leaching and further protect the estuary. HDB has 8 years experience in Polyurea Coating Marine Structures.

Marina

Owner: Two Rivers Casino Marina – Lake Roosevelt, WA -Dan Kiefer, Marina Manager
Scope of Work: Design build 26 Houseboat slip expansion complete with floating dock structures, electrical service, dock boxes and winch & cable anchorage for 80′ of water level fluctuations.
Two River Marina is an award winning marina with an outstanding reputation for customer service and fun marina/boating activities. Dan Keifer, marina manager, stated that the new slips are 100% rented for the 2012 system.