HDB Marine was selected by National Park Service to design & build a 90 slip dock expansion for Willow Beach Marina, AZ

Owner: US Department of Interior - National Park Service - Lake Mead National Recreation Area - Purchased via GSA

Scope of Work:  Design build 90 slip expansion for the Willow Beach Marina complete with floating dock structures, electrical service, fire hose safety system, and winch & cable anchorage. 

HDB Marine, a certified GSA contract holder, has mobilized crew and equipment to begin the construction of the Willow Beach Marina Expansion.  Project supervisor, Brian White, stated that in-the-water assembly and construction will begin after Memorial Day.  This project features the HDB Force 7 galvanized steel dock system with polyethylene encased flotation, and rock-face concrete deck panels. 

WB.9.16.2011.jpg

SEP 16 - IN-WATER ASSEMBLY - DOCK 1 AND 12' MAINWALK

WB1.jpg

HDB MARINE FORCE 7 FRAME SYSTEM - ALL ANGLES ARE 2" X 2" X 3/16" , HOT DIP GALVANIZED AFTER FABRICATION, SUPERIOR BOLTED CONNECTIONS DESIGN WITH FULL LOAD TRANSFER -  FAR STRONGER THAN THE MARINA INDUSTRY STANDARD

Willow_Beach_Install.jpg 

IN-WATER INSTALLATION BEGAN  9/13/2011